Renewable Energy Infrastructure
To power our growth sustainably, Ashraf & Sons is deploying two 50 MW systems—wind and solar—phased through 2026:
50 MW Wind Farm
•17 turbines x 3 MW each sited on the high-wind ridges around Nooriabad
•Integrated SCADA controls for real-time monitoring and predictive maintenance
•Annual generation -180 CWh
o 3 MW (10.8 GWh) dedicated to our factory’s operations
o 97 MW (169.2 GWh) exported to WAPDA Nooriabad
50 MW Solar PV Field
• Single-axis tracking panels across 200 acres to capture maximum daylight
• Grid-tie inverters for smooth output; optional storage interface for peak shaving
• Annual production -100 GWh, cutting >70,000 tons CO2 emissions
Benefits & Timeline
•Energy Self-Reliance: In-house 3 MW supply covers factory needs; surplus supports the local grid.
•Cost Certainty: Long-term PPAs lock in below-market tariffs.
•ESC Leadership: Enhances our green credentials for global partners.
•Q2 2025: Complete site surveys, secure permits, award equipment contracts
•Q4 2025: Lay foundations, install turbines and solar racking
•Q1-Q2 2026: Connect modules, commission systems, synchronize with grid
This infrastructure not only powers our operations but also reinforces Ashraf & Sons’ commitment to a cleaner, more resilient energy future—both for us and for Nooriabad.